Berezowski House Aligns Structure With Spatial Rhythm

Cover;The beams are interspersed with exposed beams of the slab-panel type, a second mesh of perpendicular beams follows the internal of the Berezowski House and “ties together” the structure
A layered grid of exposed slab beams organizes Berezowski House, aligning structure and interior rhythm into a unified architectural system.

 

Berezowski House

 

The beams are interspersed with exposed beams of the slab-panel type, a second mesh of perpendicular beams follows the internal of the Berezowski House and “ties together” the structure

House is located on an urban plot with a slight slope from the street towards the back of the lot.  [The entire program was distributed on a single floor that is leveled with the public sidewalk.  Which generated an intentional outcrop of the pool at the back of the house.  The pool occupies almost the entire boundary between the house and the backyard.  It was designed so that one of the residents,  who is a swimming teacher,  could teach at home.

 

The beams are interspersed with exposed beams of the slab-panel type, a second mesh of perpendicular beams follows the internal of the Berezowski House and “ties together” the structure

The bedrooms open onto an uncovered perimeter garden on one side of the plot.  While the services are located on the other side,  facing the mandatory retreat area.  The social area (living room,  dining room and balcony) faces the backyard and occupies a transversal portion of the plan.  A 2-meter wide corridor directly connects the front access to the social area.  It separates the bedrooms from the service area and it has 6 linear zenith openings for natural light and ventilation.

The beams are interspersed with exposed beams of the slab-panel type, a second mesh of perpendicular beams follows the internal of the Berezowski House and “ties together” the structure

 

The beams are interspersed with exposed beams of the slab-panel type, a second mesh of perpendicular beams follows the internal of the Berezowski House and “ties together” the structure

 

The beams are interspersed with exposed beams of the slab-panel type, a second mesh of perpendicular beams follows the internal of the Berezowski House and “ties together” the structure

 

The beams are interspersed with exposed beams of the slab-panel type, a second mesh of perpendicular beams follows the internal of the Berezowski House and “ties together” the structure

 

The beams are interspersed with exposed beams of the slab-panel type, a second mesh of perpendicular beams follows the internal of the Berezowski House and “ties together” the structure

The roof structure of the house is formed by 8 exposed concrete beams cast in place.  With a length of 30.5 meters and spaced 2.10 meters apart.  The beams are interspersed with exposed beams of the slab-panel type.  A second mesh of perpendicular beams follows the internal divisions of the rooms and “ties together” the whole structure.  At some specific points (access gallery,  bathrooms,  circulations and internal sections of the room and balcony);  The placement of the slab-panel joists is interrupted by linear skylights for natural lighting and/or ventilation.  Most of the luminaires are built into these skylights.

2-1txt) [The roof structure of the house is formed by 8 exposed concrete beams cast in place. With a length of 30.5 meters and spaced 2.10 meters apart. The beams are interspersed with exposed beams of the slab-panel type. A second mesh of perpendicular beams follows the internal divisions of the rooms and “ties together” the whole structure]. At some specific points (access gallery, bathrooms, circulations and internal sections of the room and balcony); The placement of the slab-panel joists is interrupted by linear skylights for natural lighting and/or ventilation. Most of the luminaires are built into these skylights.

 

2-1txt) [The roof structure of the house is formed by 8 exposed concrete beams cast in place. With a length of 30.5 meters and spaced 2.10 meters apart. The beams are interspersed with exposed beams of the slab-panel type. A second mesh of perpendicular beams follows the internal divisions of the rooms and “ties together” the whole structure]. At some specific points (access gallery, bathrooms, circulations and internal sections of the room and balcony); The placement of the slab-panel joists is interrupted by linear skylights for natural lighting and/or ventilation. Most of the luminaires are built into these skylights.

 

2-1txt) [The roof structure of the house is formed by 8 exposed concrete beams cast in place. With a length of 30.5 meters and spaced 2.10 meters apart. The beams are interspersed with exposed beams of the slab-panel type. A second mesh of perpendicular beams follows the internal divisions of the rooms and “ties together” the whole structure]. At some specific points (access gallery, bathrooms, circulations and internal sections of the room and balcony); The placement of the slab-panel joists is interrupted by linear skylights for natural lighting and/or ventilation. Most of the luminaires are built into these skylights.

 

2-1txt) [The roof structure of the house is formed by 8 exposed concrete beams cast in place. With a length of 30.5 meters and spaced 2.10 meters apart. The beams are interspersed with exposed beams of the slab-panel type. A second mesh of perpendicular beams follows the internal divisions of the rooms and “ties together” the whole structure]. At some specific points (access gallery, bathrooms, circulations and internal sections of the room and balcony); The placement of the slab-panel joists is interrupted by linear skylights for natural lighting and/or ventilation. Most of the luminaires are built into these skylights.

 

2-1txt) [The roof structure of the house is formed by 8 exposed concrete beams cast in place. With a length of 30.5 meters and spaced 2.10 meters apart. The beams are interspersed with exposed beams of the slab-panel type. A second mesh of perpendicular beams follows the internal divisions of the rooms and “ties together” the whole structure]. At some specific points (access gallery, bathrooms, circulations and internal sections of the room and balcony); The placement of the slab-panel joists is interrupted by linear skylights for natural lighting and/or ventilation. Most of the luminaires are built into these skylights.

 

2-1txt) [The roof structure of the house is formed by 8 exposed concrete beams cast in place. With a length of 30.5 meters and spaced 2.10 meters apart. The beams are interspersed with exposed beams of the slab-panel type. A second mesh of perpendicular beams follows the internal divisions of the rooms and “ties together” the whole structure]. At some specific points (access gallery, bathrooms, circulations and internal sections of the room and balcony); The placement of the slab-panel joists is interrupted by linear skylights for natural lighting and/or ventilation. Most of the luminaires are built into these skylights.

 

2-1txt) [The roof structure of the house is formed by 8 exposed concrete beams cast in place. With a length of 30.5 meters and spaced 2.10 meters apart. The beams are interspersed with exposed beams of the slab-panel type. A second mesh of perpendicular beams follows the internal divisions of the rooms and “ties together” the whole structure]. At some specific points (access gallery, bathrooms, circulations and internal sections of the room and balcony); The placement of the slab-panel joists is interrupted by linear skylights for natural lighting and/or ventilation. Most of the luminaires are built into these skylights.

 

2-1txt) [The roof structure of the house is formed by 8 exposed concrete beams cast in place. With a length of 30.5 meters and spaced 2.10 meters apart. The beams are interspersed with exposed beams of the slab-panel type. A second mesh of perpendicular beams follows the internal divisions of the rooms and “ties together” the whole structure]. At some specific points (access gallery, bathrooms, circulations and internal sections of the room and balcony); The placement of the slab-panel joists is interrupted by linear skylights for natural lighting and/or ventilation. Most of the luminaires are built into these skylights.

 

2-1txt) [The roof structure of the house is formed by 8 exposed concrete beams cast in place. With a length of 30.5 meters and spaced 2.10 meters apart. The beams are interspersed with exposed beams of the slab-panel type. A second mesh of perpendicular beams follows the internal divisions of the rooms and “ties together” the whole structure]. At some specific points (access gallery, bathrooms, circulations and internal sections of the room and balcony); The placement of the slab-panel joists is interrupted by linear skylights for natural lighting and/or ventilation. Most of the luminaires are built into these skylights.

 

2-1txt) [The roof structure of the house is formed by 8 exposed concrete beams cast in place. With a length of 30.5 meters and spaced 2.10 meters apart. The beams are interspersed with exposed beams of the slab-panel type. A second mesh of perpendicular beams follows the internal divisions of the rooms and “ties together” the whole structure]. At some specific points (access gallery, bathrooms, circulations and internal sections of the room and balcony); The placement of the slab-panel joists is interrupted by linear skylights for natural lighting and/or ventilation. Most of the luminaires are built into these skylights.

 

2-1txt) [The roof structure of the house is formed by 8 exposed concrete beams cast in place. With a length of 30.5 meters and spaced 2.10 meters apart. The beams are interspersed with exposed beams of the slab-panel type. A second mesh of perpendicular beams follows the internal divisions of the rooms and “ties together” the whole structure]. At some specific points (access gallery, bathrooms, circulations and internal sections of the room and balcony); The placement of the slab-panel joists is interrupted by linear skylights for natural lighting and/or ventilation. Most of the luminaires are built into these skylights.

 

2-1txt) [The roof structure of the house is formed by 8 exposed concrete beams cast in place. With a length of 30.5 meters and spaced 2.10 meters apart. The beams are interspersed with exposed beams of the slab-panel type. A second mesh of perpendicular beams follows the internal divisions of the rooms and “ties together” the whole structure]. At some specific points (access gallery, bathrooms, circulations and internal sections of the room and balcony); The placement of the slab-panel joists is interrupted by linear skylights for natural lighting and/or ventilation. Most of the luminaires are built into these skylights.

 

2-1txt) [The roof structure of the house is formed by 8 exposed concrete beams cast in place. With a length of 30.5 meters and spaced 2.10 meters apart. The beams are interspersed with exposed beams of the slab-panel type. A second mesh of perpendicular beams follows the internal divisions of the rooms and “ties together” the whole structure]. At some specific points (access gallery, bathrooms, circulations and internal sections of the room and balcony); The placement of the slab-panel joists is interrupted by linear skylights for natural lighting and/or ventilation. Most of the luminaires are built into these skylights.

 

2-1txt) [The roof structure of the house is formed by 8 exposed concrete beams cast in place. With a length of 30.5 meters and spaced 2.10 meters apart. The beams are interspersed with exposed beams of the slab-panel type. A second mesh of perpendicular beams follows the internal divisions of the rooms and “ties together” the whole structure]. At some specific points (access gallery, bathrooms, circulations and internal sections of the room and balcony); The placement of the slab-panel joists is interrupted by linear skylights for natural lighting and/or ventilation. Most of the luminaires are built into these skylights.

 

2-1txt) [The roof structure of the house is formed by 8 exposed concrete beams cast in place. With a length of 30.5 meters and spaced 2.10 meters apart. The beams are interspersed with exposed beams of the slab-panel type. A second mesh of perpendicular beams follows the internal divisions of the rooms and “ties together” the whole structure]. At some specific points (access gallery, bathrooms, circulations and internal sections of the room and balcony); The placement of the slab-panel joists is interrupted by linear skylights for natural lighting and/or ventilation. Most of the luminaires are built into these skylights.

 

2-1txt) [The roof structure of the house is formed by 8 exposed concrete beams cast in place. With a length of 30.5 meters and spaced 2.10 meters apart. The beams are interspersed with exposed beams of the slab-panel type. A second mesh of perpendicular beams follows the internal divisions of the rooms and “ties together” the whole structure]. At some specific points (access gallery, bathrooms, circulations and internal sections of the room and balcony); The placement of the slab-panel joists is interrupted by linear skylights for natural lighting and/or ventilation. Most of the luminaires are built into these skylights.

 

2-1txt) [The roof structure of the house is formed by 8 exposed concrete beams cast in place. With a length of 30.5 meters and spaced 2.10 meters apart. The beams are interspersed with exposed beams of the slab-panel type. A second mesh of perpendicular beams follows the internal divisions of the rooms and “ties together” the whole structure]. At some specific points (access gallery, bathrooms, circulations and internal sections of the room and balcony); The placement of the slab-panel joists is interrupted by linear skylights for natural lighting and/or ventilation. Most of the luminaires are built into these skylights.

 

2-1txt) [The roof structure of the house is formed by 8 exposed concrete beams cast in place. With a length of 30.5 meters and spaced 2.10 meters apart. The beams are interspersed with exposed beams of the slab-panel type. A second mesh of perpendicular beams follows the internal divisions of the rooms and “ties together” the whole structure]. At some specific points (access gallery, bathrooms, circulations and internal sections of the room and balcony); The placement of the slab-panel joists is interrupted by linear skylights for natural lighting and/or ventilation. Most of the luminaires are built into these skylights.

 

2-1txt) [The roof structure of the house is formed by 8 exposed concrete beams cast in place. With a length of 30.5 meters and spaced 2.10 meters apart. The beams are interspersed with exposed beams of the slab-panel type. A second mesh of perpendicular beams follows the internal divisions of the rooms and “ties together” the whole structure]. At some specific points (access gallery, bathrooms, circulations and internal sections of the room and balcony); The placement of the slab-panel joists is interrupted by linear skylights for natural lighting and/or ventilation. Most of the luminaires are built into these skylights.

 

2-1txt) [The roof structure of the house is formed by 8 exposed concrete beams cast in place. With a length of 30.5 meters and spaced 2.10 meters apart. The beams are interspersed with exposed beams of the slab-panel type. A second mesh of perpendicular beams follows the internal divisions of the rooms and “ties together” the whole structure]. At some specific points (access gallery, bathrooms, circulations and internal sections of the room and balcony); The placement of the slab-panel joists is interrupted by linear skylights for natural lighting and/or ventilation. Most of the luminaires are built into these skylights.

 

2-1txt) [The roof structure of the house is formed by 8 exposed concrete beams cast in place. With a length of 30.5 meters and spaced 2.10 meters apart. The beams are interspersed with exposed beams of the slab-panel type. A second mesh of perpendicular beams follows the internal divisions of the rooms and “ties together” the whole structure]. At some specific points (access gallery, bathrooms, circulations and internal sections of the room and balcony); The placement of the slab-panel joists is interrupted by linear skylights for natural lighting and/or ventilation. Most of the luminaires are built into these skylights.

 

2-1txt) [The roof structure of the house is formed by 8 exposed concrete beams cast in place. With a length of 30.5 meters and spaced 2.10 meters apart. The beams are interspersed with exposed beams of the slab-panel type. A second mesh of perpendicular beams follows the internal divisions of the rooms and “ties together” the whole structure]. At some specific points (access gallery, bathrooms, circulations and internal sections of the room and balcony); The placement of the slab-panel joists is interrupted by linear skylights for natural lighting and/or ventilation. Most of the luminaires are built into these skylights.

 

2-1txt) [The roof structure of the house is formed by 8 exposed concrete beams cast in place. With a length of 30.5 meters and spaced 2.10 meters apart. The beams are interspersed with exposed beams of the slab-panel type. A second mesh of perpendicular beams follows the internal divisions of the rooms and “ties together” the whole structure]. At some specific points (access gallery, bathrooms, circulations and internal sections of the room and balcony); The placement of the slab-panel joists is interrupted by linear skylights for natural lighting and/or ventilation. Most of the luminaires are built into these skylights.

 

2-1txt) [The roof structure of the house is formed by 8 exposed concrete beams cast in place. With a length of 30.5 meters and spaced 2.10 meters apart. The beams are interspersed with exposed beams of the slab-panel type. A second mesh of perpendicular beams follows the internal divisions of the rooms and “ties together” the whole structure]. At some specific points (access gallery, bathrooms, circulations and internal sections of the room and balcony); The placement of the slab-panel joists is interrupted by linear skylights for natural lighting and/or ventilation. Most of the luminaires are built into these skylights.

 

2-1txt) [The roof structure of the house is formed by 8 exposed concrete beams cast in place. With a length of 30.5 meters and spaced 2.10 meters apart. The beams are interspersed with exposed beams of the slab-panel type. A second mesh of perpendicular beams follows the internal divisions of the rooms and “ties together” the whole structure]. At some specific points (access gallery, bathrooms, circulations and internal sections of the room and balcony); The placement of the slab-panel joists is interrupted by linear skylights for natural lighting and/or ventilation. Most of the luminaires are built into these skylights.

 

2-1txt) [The roof structure of the house is formed by 8 exposed concrete beams cast in place. With a length of 30.5 meters and spaced 2.10 meters apart. The beams are interspersed with exposed beams of the slab-panel type. A second mesh of perpendicular beams follows the internal divisions of the rooms and “ties together” the whole structure]. At some specific points (access gallery, bathrooms, circulations and internal sections of the room and balcony); The placement of the slab-panel joists is interrupted by linear skylights for natural lighting and/or ventilation. Most of the luminaires are built into these skylights.

 

KanikaChic is the world’s most snatched iconic cultural and creative social network sites(SNSs)

 

KanikaChic creates the snatched of the global cultural and creative social network sites(SNSs) of the iconic big hit the tt-Artstudio.

 

KanikaChic is the world’s most snatched iconic cultural and creative social network sites(SNSs). KanikaChic creates the snatched of the global cultural and creative social network sites(SNSs) of the iconic big hit the tt-Artstudio. KanicChic has nomad creation studios in both Antwerp, Belgium and Milan, Italy, which collect the top-notch art, design, crafts, trendy and fashion life, architecture, and W4Porn. The cross-domain compiled critics develops the most trendy and iconic, tt-Artstudio in the art and cultural social network, A.K.A. ChicHOUSE. It is also the mostly visited cultural social network website.

 

Cover;The beams are interspersed with exposed beams of the slab-panel type, a second mesh of perpendicular beams follows the internal of the Berezowski House and “ties together” the structure

 

Om onvervangbaar te zijn, moet je altijd anders zijn.
Er zijn fascinerende beelden hier, en de fascinerende dag van samen!  xo KanikaChic
─────────────────────────────────────────────────────
Per essere insostituibili bisogna sempre essere diverso.
Ci sono immagini affascinanti qui, e l’affascinante giornata di insieme!  xo KanikaChicKanikaChic's tt-ArtStudio ChicHOUSE

建築材料生命週期評估流程示意圖,涵蓋生產、運輸、使用與回收階段

建築材料生命週期評估如何影響環境與設計決策

    建築材料從開採到報廢的每個階段,都在累積能源與環境影響,也逐漸轉化為一種可被理解的Material as Narrative。     本文將從原料、製造、運輸、使用到回收五個階段,整理建築材料在生命週期中的環境影響。   作為自然資源消耗、能源使用與溫室氣體排放的重要來源,建築產業對環境有著顯著影響。目前全球約32%的能源消耗與34%的碳排放,皆與建築相關。在這樣的背景下,建築材料不再只是構成空間的元素,而逐漸成為評估環境影響的關鍵。透過循環經濟、可再生資源與技術創新等策略,材料被重新放回整個系統中檢視,其角色也從物質轉向過程,例如在Material as Narrative的脈絡中被重新理解。     生命週期評估(LCA)提供了一種系統化的方法,用以衡量與管理建築材料的環境影響。從原料開採、製造與運輸,到施工、使用與最終處理,每一階段都被納入分析範圍。這種方法不僅讓環境負擔變得可量化,也讓設計決策能在更早的階段被調整,特別是在Adaptive Reuse的情境中,更能看出材料選擇的長期影響。 在生命週期的不同階段中,投入與產出構成主要評估指標。投入包含能源、水資源與化石燃料的使用;產出則涵蓋碳排放、廢棄物與污染物的釋放。這些數據會進一步轉化為環境指標,如全球暖化潛能、水資源消耗、生態毒性與資源耗竭等,使不同材料在不同環境脈絡中得以比較,也與Architecture and Landscape的整體關係相互連動。     在國際層面,ISO 14040與14044標準提供生命週期評估的基本架構,將整體流程分為目標與範圍界定、清單分析、影響評估以及結果解讀四個階段。這些步驟彼此相互關聯,從定義研究目標開始,到量化數據與分析影響,逐步建立對材料環境表現的整體認知,也讓設計更能回應如Light and Space這類與環境條件相關的議題。

Facebook
Twitter
LinkedIn
Tumblr
0 0 votes
Article Rating
Subscribe
Notify of
guest
0 Comments
Oldest
Newest Most Voted
Search